Service 08 · Finished products

Product assembly and set kitting

We turn parts into a finished product: fitting hardware, gluing and assembling bodies, building kits with inserts. The output is a product ready for packaging and shipping.

5,000UNITS / DAY
100%COMPLETENESS CHECK
OURS + YOURSPARTS IN PRODUCTION
Fitting hardware into a product body at the assembly station Assembly station · every unit inspected

From parts — to a finished product

Assembly turns a stack of parts into a product: fitting hardware, gluing bodies, kitting sets to specification. Every operation is written into an assembly card — units in the batch come out identical, whoever is on the line.

Inspection is built into the flow: mechanics, appearance and completeness are checked on every unit, not by sampling. A defective part is replaced on the spot — only inspected product goes to shipping.

What’s included

What the assembly station does

Manual operations with production discipline: checklists, inspection, repeatability.

01Hardware fittingHinges, clasps, magnets, handles, feet — mortised and fixed per the design.
02Gluing & body assemblyBoxes, cases, organizers and lamps are assembled into finished products.
03Set kittingKits of dozens of items built to specification, with no mix-ups.
04InsertsInstructions, cards, filler and protective padding.
05Working with your partsWe take your components into the warehouse and include them in the assembly.
06Quality controlEvery unit is checked: mechanics, appearance, completeness.
Capabilities

Service parameters

Assembly scales from a single sample to a serial flow.

ParameterValue
ThroughputUp to 5,000 units a day depending on the product
HardwareHinges, clasps, magnets, handles — sourced for the job or supplied by you
KittingSets to specification, inserts, filler
PartsMade in-house or customer-supplied
Billing unitPer unit: price depends on the number of parts and operations

Before the series we assemble a control sample and lock in the specification — the batch repeats it one to one. Billing unit: per unit — details in Pricing.

How it works

How an order works

Approval at every step: you see the product before the run starts.

STEP 01SpecificationProduct contents, hardware, inserts.
STEP 02Assembly sampleA control unit — we approve the mechanics and the look.
STEP 03SeriesLine assembly with every unit inspected.
STEP 04To packagingFinished products move on to the packaging and shipping station.
Applications

Where it's used

Everything made of more than one part — from a case box to a board game.

Case boxes Gift sets Board games Lamps Organizers
In short

Frequently asked questions

Can I bring my own components?
Yes: we take your parts and hardware into the warehouse, track them and include them in the assembly alongside our own.
How is assembly quality controlled?
We assemble to an approved sample and a checklist: mechanics, appearance and completeness are checked on every unit.
What hardware is available?
Hinges, clasps, magnets, handles, feet, fasteners — from stock or to order. We'll match it to the product's design and budget.
Do you kit sets from different items?
Yes, kitting is a discipline of its own: a set of dozens of items is built to specification with no mix-ups.
What happens to units that fail inspection?
Rejects never enter the batch: defective units are taken apart, parts are replaced, and only inspected product goes to shipping.
Full cycle

Related services

Every operation happens under one roof — your order is never passed between subcontractors.

Project quote

Describe your product — we'll quote the assembly

We'll assess the number of operations and return a per-unit price within one business day.

Quote request

Drag files here or click to browse

DXF · AI · CDR · PDF · SVG · JPG · PNG — up to 25 MB

    What affects the price

    • Number of parts and assembly operations
    • Hardware type and fixing method
    • Kit contents and inserts
    • Run size and deadlines
    No print-ready file? No problem A sketch, a photo, a reference or a plain description is enough — we prepare the design and cutting files ourselves.
    Reply within one business day A process engineer reviews the task and selects the technology; a manager returns with price and lead time.
    billing unit — per unit

    A detailed reply within one business day

    A process engineer reviews your file and selects material and settings; a manager returns with price and lead time.